The construction works of tarmacking a two and half kilometer Nyakasanga road that stretches from Ki-Redcross through Habitat-Nyamwamba to Nyakasanga bridge on the Kasese Fort-portal road has commenced.
According to the resident engineer Hima Kathunguru road rehabilitation project Eng. Luswata Buzibwa, the road that will have a drainage system and lights will cost about 7.5 billion shillings and is estimated to take them three months. Eng. Luswata speaking……..
During his site inspection in Nyamwamba division yesterday, the Kasese Municipality MP, Hon Robert Centenary said that the road would be the first of its kind in the area, before calling for total cooperation by the local residents. Hon Centenary speaking..….
Later yesterday, Hon. Centenary handed over equipment worthy five million to Kilembe quarter wielding company with an aim to improve their income sources. END